We utilized structural truss joists for the flooring system, but increased their depth and frequency to make a rigid and strong floor. It is not uncommon to have this type of floor bounce and be on the noisy side. Gluing 1 1/4" structural flooring to the joists that exceed engineering requirements substantially will give us a stable and quiet floor system.
The steel erectors finished the columns for the garage entry and front bridge. They then installed the steel pan decking that will support the concrete for these areas.



Greg Lesher and his sons (many of my contractors are family, several of which are third generation) continue to work on the court planters and columns and their stone facing.


View from the street below of the steel structure and scaffolding for underfloor work.