Steel frame and concrete block planter



Today we finished erecting the structural steel frame for Sonoma. The large I beams were placed with a crane and bolted into place. Tomorrow the steel will be inspected by a structural engineer for proper assembly and weld standards. We also started a block wall planter for the front retaining wall and lower courtyard. There is also a picture of the stone we are using for the facing and on the accents for Sonoma.